SUN STREAK: Congressionally Directed Actions — Special Input for CBJB Submission
This 7-page DIA report, prepared as a special input for a CBJB submission and dated 14 February 1991, summarizes the status and progress of the SUN STREAK program — a classified psychoenergetics/parapsychology effort — in response to tasks specified in the FY 1991 conferees report. DIA, acting as executive agent, describes a management structure centered in the DT-S unit at Ft. Meade under the Assistant Deputy Director for Scientific and Technical Intelligence, with oversight from a Project Review Board and Scientific Oversight Committee. The report notes 10 full-time personnel (7 civilian, 3 military), facility renovations, transfer of the program from Special Access Program (SAP) status to Limited Dissemination (LIMDIS) status, database and ADP planning, and an external basic and applied research contract (solicitation sent 31 January 1991, award expected by mid-April 1991). It records that in-house staff had performed investigations on at least 10 projects, though formal evaluation was incomplete, and outlines a long-range comprehensive research plan. An appendix lists project publications and investigation summary reports (DT-S series, October 1990–February 1991). The document was approved for release by the CIA on 18 April 2003.
Description
A SECRET/NOFORN/LIMDIS Defense Intelligence Agency status report dated 14 February 1991 documenting DIA's implementation of Congressionally directed tasks for the SUN STREAK psychoenergetics (remote viewing) program, covering management structure, staffing, facilities, security reclassification, external research contracting, and in-house investigations.
Claims
DIA implemented Congressionally directed tasks for an external basic and applied research effort plus in-house phenomenological investigations under the SUN STREAK program.
90%The SUN STREAK program was transferred from Special Access Program (SAP) status to Limited Dissemination (LIMDIS) status, with a new project codeword identified.
90%DIA implemented an external basic and applied research effort and in-house phenomenological investigations for SUN STREAK as directed by the FY 1991 Congressional conferees report.
90%10 full-time personnel (7 civilian, 3 military) were assigned to the activity, located at Ft. Meade.
88%SUN STREAK was transferred from Special Access Program status to Limited Dissemination status with a new project codeword.
88%In-house staff had performed investigations on at least 10 projects, though formal evaluation was not yet complete.
85%The program's in-house staff performed investigations on at least 10 projects, though formal evaluation was not yet complete.
85%The research addressed neurophysiological correlate measures, personnel selection techniques, and application effectiveness evaluation for the psychoenergetics area.
85%Ten full-time personnel (7 civilian, 3 military) were assigned to the activity at Ft. Meade.
85%The research plan addressed neurophysiological correlate measures, personnel selection techniques, and application effectiveness evaluation for the phenomenological area.
80%
Events
Jan 30, 1991
External research solicitation letter sent
Solicitation letter for first-year basic and applied research contract dispatched, with award expected by mid-April 1991.
Feb 13, 1991
SUN STREAK status report prepared for CBJB submission
DIA special input summarizing program status and progress on Congressionally directed tasks.
May 31, 1991
Planned comprehensive report update
A comprehensive update to the report planned for June 1991.
Apr 17, 2003
CIA approval for release
Document declassified and approved for public release.
Feb 13, 1991
SUN STREAK special input report prepared
DIA status and progress report for CBJB submission on Congressionally directed SUN STREAK tasks.
Program security reclassification
SUN STREAK transferred from Special Access Program (SAP) status to Limited Dissemination (LIMDIS) status with a new codeword.
May 31, 1991
Planned comprehensive update
A comprehensive update to the report and a long-range research plan publication anticipated in the May–June 1991 timeframe.
Apr 17, 2003
Document approved for release
CIA approved the document for public release.
Dates mentioned
Keywords
Entities
Organizations
Topics
Phenomena
Extracted text (OCR)
SECRET Approved For Release 2003/04/18 : CIA-RDP96-00789R002100260042-5 CONGRESSIONALLY DIRECTED ACTIONS -— SUN STREAK SPECIAL INPUT FOR CBJB SUBMISSION 14 FEBRUARY 1991 REPRODUCTION REQUIRES APPROVAL OF ORIGINATOX OR HIGHER DOD AUTHORIYy FURTHER DISSEMINATION ONLY AS DIRECTED BY DY OR HIGHER DOD AUTHORIYy ECRET NOT RELWASABLE TO FOREIGN NATIONALS \.IMITED DISSEMINATION Enclosure to S-20,514/DT-S Approved For Release 2003/04/18 : CIA-RDP96-00789R002100260042-5 Lf SECRET 7 Approved For Release 2003/04/18 : CIA-RDP96-00789R002100260042-5 I. (U) PROGRAM STATUS AND PROGRESS: 1. (U) GENERAL: (S/NF/LIMDIS) DIA has given high priority to accomplishing the Congressionally directed tasks specified in the FY 1991 conferees report for SUN STREAK. These tasks direct DIA to implement an external basic and applied research effort and to perform a variety of in-house activities in the SUN STREAK phenomenological area. In-house activities include research support, phenomenological investigations, and assessments of foreign research. Status and progress of program activities are summarized in this report. The agenda cites recent DIA publications that contain details on the key activities required for this effort. A comprehensive update to this report is planned for June 1991; significant investigation results or research findings will be made available as they occur. 2. (U) MANAGEMENT STRUCTURE: a. (S/NF) DIA, as executive agent, has implemented a management structure that fosters a proactive, responsive, and creative environment for this activity. Both external research and in-house activities are centered in one unit (DT-S) under the direct supervision of the Assistant Deputy Director for | Scientific and Technical Intelligence (DIA/DT). The DT-S unit manager also receives technical and management guidance from DIA'S Research and Technology Division (DT-5). b. (S/NF) Project oversight is provided by a Project Review Board (PRB) that is composed of five senior management individuals selected from areas of DIA outside of DT. Additional review/guidance is available from DIA's Executive Director and from the Deputy Director. The General Defense Intelligence Program (GDIP) Director also conducts project reviews and provides guidance. Links with the IC Staff have been established to provide a broader management and program review base. 3. (U) PROGRAM PLAN: a. (U) The first action completed at program initiation was the development of a detailed action/milestone plan. This plan identified necessary steps, individual responsibilities, schedules, and documentation requirements for all key near term activities, both external and internal. It also paved the way for developing far term actions. The near term actions covered over fifteen specific topics as identified in Section I., of the appendix; other program actions are also documented in project memoranda. 1 S EC RET / NOFORN / LIMDIS Approved For Release 2003/04/18 : CIA-RDP96-00789R002100260042-5 Approved For Release 2003/04/18 : CIA-RDP96-00789R002100260042-5 a b. (S/NF) One of the major initial actions was completion of a basic and applied research plan for external assistance. This document identified key research support needs and addressed neurophysiological correlate measures, techniques for personnel selection, application effectiveness evaluation and a variety of other topics relevant to understanding and developing this phenomenological area. This research plan led to development of the external contract statement of work. 4. (U) PROGRAM STATUS: a. (C) Staffing: At receipt of the Congressional direction, DIA augmented the existing SUN STREAK staff with two senior professionals and one technical/administrative assistant. There are currently 10 full-time personnel assigned to this activity (7 civilian, 3 military). Some of the personnel previously associated with this project will also be utilized on - a consultant, or as a reserve duty, basis. b. (S/NF) Facilities: A thorough review of the existing SUN STREAK facility was performed from a health/safety and a functional viewpoint. A variety of action items were identified and appropriate funds were transferred to Ft. Meade where the DT-S unit is located for accomplishing necessary renovations. This work is now in the engineering design phase. c. (S/NF) Security: The SUN STREAK program has been transferred from Special Access Program (SAP) status to Limited Dissemination (LIMDIS) status. All necessary security steps have been identified and appropriate procedures have been recorded in project documentation. A new project codeword has been identified and the new procedures are in the process of being implemented. d. (S/NF) Data bases: All major data bases have been identified and steps are now in progress to enable them to be accessed and made available to project personnel. This includes foreign data base sources as well as select domestic research helpful for understanding this phenomenological area. e. (S/NF) Automated Data Processing (ADP)/Support Equipment: All major equipment needs have been identified and funding is now being allocated for equipment purchases. ADP needs will be selected based on a systems engineering viewpoint. Data processing needs address both external (foreign) data sources, general/specific bibliographic data, and data generated by in-house activity. S EC RET / NOFORN / LIMDIS Approved For Release 2003/04/18 : CIA-RDP96-00789R002100260042-5 / SECRET L ; Approved For Release 2003/04/18 : CIA-RDP96-00789R002100260042-5 f£. (S/NF) External Research: A comprehensive first-year basic and applied research program has been identified and a contract package has been prepared. The solicitation letter was sent on 31 January 1991; contract award should occur by mid April 1991. The external research will be monitored by a Scientific Oversight Committee (SOC) and a Policy Review Board. The SOC will be composed of five leading scientists selected from various disciplines. This committee will be established immediately SGIA after contract award. h. (S/NF/LIMDIS) In-House Activity: (1) (S/NF) Tasking: A tasking procedure for project investigations has been established. Initial requirements are provided to DIA/DT for appropriate controls. Tasks are then provided to DT-S for action. Eventually, as investigation activity expands in scope, tasking procedures may be expanded to include a wider range of potential users. (2) (S/NF) Evaluation/Review: An extensive review process has been implemented that involves formal tasking of several support and all-source analytical elements throughout DIA. In addition, a Project Review Board composed of five senior management personnel from throughout DIA (excluding DT) assists in the review and evaluation process. Formal responses are required for all tasked projects. (3) (S/NF) Investigations: All steps required for proper conduct of project investigations have been identified. This includes detailed documentation of appropriate protocols, procedures and record requirements. Details and specific protocol examples are contained in several of the publications listed in the appendix. This material was based on approaches used in scientific research and is methodologically sound. The staff has thus far performed investigations on at least 10 projects. Formal evaluation is not yet complete. Plans are now underway to integrate in-house activities with external research, where appropriate. 3 S EC R E T / NOFORN / LIMDIS Approved For Release 2003/04/18 : CIA-RDP96-00789R002100260042-5 a vA Approved For Release Roskearts : Bn -Kop$e-00789R002100260042-5 (4) (S/NF) Staff Development: All DT-S staff members are encouraged to take advantage of intelligence professional development courses. They are also encouraged to attend seminars/conferences in the SUN STREAK phenomenological area. Recently, five members attended such a conference. Additional conferences have been identified for attendance later this year. II. (S/NF) LONG-RANGE COMPREHENSIVE RESEARCH PLAN (S/NF) This is one of the major activities identified in the Congressional direction. DIA has initiated this action and has identified several major long-term research goals. These are addressed in the basic and applied research plan developed at project start. There are, however, a variety of other research topics that need to be examined and developed in an integrated approach that involves a multilaboratory approach. (S/NF) Development of this long-range plan will require extensive review and consultation with leading researchers. It is anticipated that most of this review will be complete by the May-June timeframe, at which time a detailed publication will be made available. This long-range plan will also clearly identify how external and internal activities are linked, and will establish a variety of comprehensive research and investigation objectives. 4 S ECR ET / NOFORN / LIMDIS Approved For Release 2003/04/18 : CIA-RDP96-00789R002100260042-5 I. 1. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. Approved For Release 2003/04/18 : CIA-RDP96-00789R002100260042-5 SUPPORT/BASELINE DOCUMENTS APPEND IX PROJECT PUBLICATIONS REPORT NO. DT-S-1003-S DT-S-1004-S DT-S-1005-S DT-S-1006-SS DT-S-1007-S DT-S-1008-S DT-S-1009-S DT-S-1010-S DT-S-1012-S DT-S-1013-S DT-S-1015-SL DT-S-1016-S DT-S-1017-S DT-S-1019-S DT-S-1021-SS DT-S-1026-SL DT-S-1028-SL 21 29 20 19 13 10 10 15 15 17 18 17 24 15 DATE NOV NOV NOV NOV NOV DEC DEC DEC JAN JAN JAN JAN JAN JAN JAN JAN FEB 90 90 90 90 90 90 90 90 91 91 91 91 91 91 91 91 91 TITLE COLLECTION REQUIREMENTS-— PSYCHOENERGETICS BASIC AND APPLIED RESEARCH- GENERAL PLAN BIBLIOGRAPHIC DATA BASE- PSYCHOENERGETICS OPERATIONAL PROJECT PROTOCOLS BASIC AND APPLIED RESEARCH- FIRST YEAR OBJECTIVES AUTOMATIC DATA PROCESSING (ADP) SYSTEM REQUIREMENTS PROTOCOL FOR BEACON PERSON TARGETING EVALUATION METHODS POTENTIAL TASKING MECHANISM PRELIMINARY ASSESSMENT OF FOREIGN PSYCHOENERGETICS ACTIVITY DEMONSTRATION INITIAL COLLECTION PLANS - PSYCHOENERGETICS PROJECT REVIEW BOARD -- PROJECT UPDATE END OF TOUR REPORT END OF TOUR REPORT SECURITY PROCEDURES Approved For Release 2003/04/18 : CIA-RDP96-00789R002100260042-5 II. INVESTIGATIONS REPORT 1. DT-S-1001-S 2. DT-S-1002-S 3. DT-S-1011-SL 4. DT-S-1014-SL. 5. DT-S-1018-SL 6. DT-S-1020-SL 7. DT-S-1022-SL 8. DT-S-1023-SL 9. DT-S-1024-SL 10. DT-S-1025-SL 11. DT-S-1027-SL Approved For Release 2003/04/18 : CIA-RDP96-00789R002100260042-5 Approved For Release 2003/04/18 : CIA-RDP96-00789R002100260042-5 DATE 30 14 17 17 23 23 23 24 31 OCT NOV JAN JAN JAN J AN JAN JAN JAN JAN JAN 90 91 91 91 91 91 91 91 91 91 TITLE SUMMARY REPORT SUMMARY REPORT SUMMARY REPORT SUMMARY REPORT - PROJ. 91002-1 SUMMARY REPORT SUMMARY REPORT SUMMARY REPORT SUMMARY REPORT SUMMARY REPORT SUMMARY REPORT PROJ. PROJ. PROJ. PROJ. PROJ. PROJ. PROJ. PROJ. PROJ. PROJ. 90104 90104-1 91001 91002 91005 91003 91006 91007 91004 91008
Related files
Connected through the network
SF-2026-000722
